Guides
From the stamp side
Working notes from the engineer of record on EVre projects — what plan reviewers and utilities actually ask for, written for the people who have to build it.
-
Stamped EV Charger Permit Drawings for Contractors
What an electrical contractor needs from the engineer of record to clear plan review the first time: sheet by sheet, load calc to utility letter.