Projects
Built here
Real projects with real numbers — because "trust us" isn't an engineering document. From a DC fast charging hub for the University of Missouri–Kansas City to two fast chargers inside a live shopping center, every one of these ran on EVre engineering.
In progress
UMKC Campus Charging Program
EVre-funded, PE-engineered, built, owned, and operated DC fast charging hub on UMKC's Hospital Hill campus, with a quarterly revenue share paid to UMKC
$0 cost to the university
Dierbergs Lakeview Pointe
Replaced outdated chargers with modern DC fast charging at a grocery-anchored center
Equipment modernization
Olympic Oaks Village
Two DC fast chargers delivered inside an active retail shopping center
$200K total installed cost
KCMO Health Department
Site assessment and engineering that turned a hardware purchase into a constructable workplace-charging project
Advisory → sealed construction drawings